BRAC U.S. Army Reserve Training Center (LEED Gold, New Construction, 2.2)


Ceiba, Puerto Rico
Area: 78,350 square feet
Budget: $22.5 million
Completion date: June 2012
Design partners: Architects: SMRT, Portland, Maine; Local architect: McCullough Dominguez; Contractor: Consigli Construction
Services provided: LEED / Sustainable Design Consultant
Energy and environmental design strategies incorporated: 30%+ energy savings; 40%+ water savings; storm water load reduction; 75%+ construction waste diverted; 10%+ recycled-content materials; Interior Environmental Quality focus: low-emitting finish materials
Energy and environmental design strategies incorporated:
Energy Savings
30%
Water savings; stormwater load reduction
40%
Construction waste diverted
75%
Recycled content
13%